Inclusions - Victoria
Executive | Designer | Standard Siteworks
Standard Siteworks Inclusions
Included with both Executive and Designer Inclusions packages:
- Earthworks levelling of building platform with up to 600mm of fall over home area including rock excavation
- Wind Velocity Classification N1 is used to design frames and trusses as per AS 1684
- External sewer drainage and connection to existing junction within 10 metres of home including rock excavation
- Stormwater drainage of roof water to street or easement on block within 10 metres including rock excavation
- Water service connection within 10 metres
- Provide conduit and cabling for underground connection of single phase electricity to meter box, including mains connection fee & metering within 10 metres excluding rock excavation
- Provide termite treatment system to the perimeter of the concrete slab perimeter & all penetrations if required by the local council
- Provide an engineer certified “M” or “H” class slab designed for site classifications as recommended by AS2870-1990
- Geo-fabric sediment control, and waste receptacle if required by Council during construction period
- Provide temporary fencing and scaffolding during construction (if required)